The Millennium Falcon Build Diary Issue 79

HomeForumsBuild DiariesThe Millennium Falcon Build Diary Issue 79

This topic contains 0 replies, has 1 voice, and was last updated by  De Agostini 11 months, 3 weeks ago.

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #22303

    De Agostini
    Administrator

    In this busy stage you attach numerous plant-on details to the inner and outer sides of the starboard mandible before adding a small section of side frame (SF-10) and a small section of plating (SP-17) that form the mount for the mandible’s headlight, which you test and install. There is a lot of gluing to do so make sure you have enough adhesive standing by before you get started.

    Parts needed:
    Sprue holding 12 identical items supplied with Issue 78
    Sprue holding 8 items supplied with Issue 78
    Sprue holding 13 items supplied with Issue 79
    Sprue holding 14 items supplied with Issue 79
    Side frame SF-10 (mandible) supplied with Issue 79
    (Note that SP-17 is supplied on the sprue holding 14 items)
    2 countersunk screws supplied with Issue 79
    LED headlight supplied with Issue 79
    2 short brass-coloured self-tapping screws

    parts

    Tools and other items needed
    If you do everything that is described in the Stage 79 Assembly section of the magazine you will need the following:
    Screwdriver supplied with Issue 2, or similar
    Side cutters or similar
    Craft knife
    Needle file or fine sanding pads or sticks
    Cutting board
    Cyanoacrylate instant glue, also known as superglue
    Cocktail sticks
    Tweezers

    Adding the inner details
    When you remove the 12 identical parts from the smaller of the two sprues you can easily reach one of the attachment points of each of the parts with cutters. The other attachment point is less easy to reach so you might have to remove each of these identical details from the sprue by first cutting the accessible attachment point and then carefully twisting the detail with your fingers until the plastic gives and it comes off the sprue. After removal tidy up any unwanted plastic with a file or sanding stick. Take care when you have to remove plastic from the area between the holes in the 12 identical details. A thin file is needed or one with a narrow end. You might find a bit of plastic between the pins on one or more of the 12 identical details stops the detail seating properly on detail (1) or (2). If this is the case, carefully file it off. Apart from this, the details you add to the inside of the mandible should all go on easily.

    detail 1

    detail 2

    detail 3

    detail 4

    detail 5

    detail 6

    detail 7

    detail 8

    detail 9

    detail 10

    detail 11

    detail 12

    detail 13

    detail 14

    detail 15

    detail 16

    detail 17

    detail 18

    detail 19

    detail 20

    detail 21

    detail 22

    detail 23

    detail 24

    detail 25

    detail 26

    detail 27

    detail 28

    detail 29

    detail 30

    detail 31

    Adding the outer details
    Some of the parts are really very small, but the details for the outer side of the mandible should go on easily. Just remember that if a test fit reveals that a part is not held neatly in place by its pins, tabs or whatever to hold it in its correct orientation for a few seconds until the bond forms when you stick it down.
    Details (3), (4), (5) and (6) are particularly small so be very careful if you have to remove excess plastic from them. Only the lightest of touches is needed to clean up (5) and (6). Watch that you do not inadvertently cut off the end of (10) when you remove it from the sprue and hold (11) parallel with the sides until the glue has set. Detail (19) might need a bit more filing or trimming where it joined the sprue than some of the others. Hold (20) and (21) in position while the glue sets so that they are aligned with the sides of the mandible.

    outer 1

    outer 2

    outer 3

    outer 4

    outer 5

    outer 6

    outer 7

    outer 8

    outer 9

    outer 10

    outer 11

    outer 12

    outer 13

    outer 14

    outer 15

    outer 16

    outer 17

    outer 18

    outer 19

    outer 20

    outer 21

    outer 22

    outer 23

    outer 24

    outer 25

    outer 26

    outer 27

    outer 28

    outer 29

    outer 30

    outer 31

    outer 32

    outer 33

    outer 34

    outer 35

    outer 36

    outer 37

    outer 38

    outer 39

    outer 40

    outer 41

    outer 42

    outer 43

    outer 44

    outer 45

    outer 46

    outer 47

    outer 48

    outer 49

    outer 50

    outer 51

    outer 52

    outer 53

    outer 54

    outer 55

    outer 56

    outer 57

    outer 58

    outer 59

    outer 60

    outer 61

    outer 62

    outer 63

    outer 64

    outer 65

    outer 66

    Adding the headlight
    This should not be a challenge. Make sure that the countersunk holes of SF-10 are facing outwards before you screw it down. Remember to check the LED before you glue it in position.

    light 1

    light 2

    light 3

    light 4

    light 5

    light 6

    light 7

    light 8

    light 9

    light 10

    light 11

    light 12

    light 13

    light 14

    light 15

    light 16

    light 17

    light 18

    light 19

    light 20

    light 21

    Tidy up and store
    Put the assembly away somewhere safe and store the parts supplied with this issue but not used this time back in the parts pack for Issue 79 so you know where to find them.

Viewing 1 post (of 1 total)

The forum ‘Build Diaries’ is closed to new topics and replies.