The Millennium Falcon Build Diary Issue 65

HomeForumsBuild DiariesThe Millennium Falcon Build Diary Issue 65

This topic contains 0 replies, has 1 voice, and was last updated by  De Agostini 1 year, 6 months ago.

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #20512

    De Agostini
    Administrator

    In this stage you reach another milestone in your construction of your Falcon model when you finish off the upper frame. The two frame sections you add – TF-39 and TF-40 – secured in position with the help of a section of radial rib plus screws and connectors, fill in the gaps left over from the last stage when you completed the circle of the frame.

    Parts needed:
    Hull frame section TF-39 supplied with Issue 65
    Hull frame section TF-40 supplied with Issue 65
    Radial rib inner section supplied with Issue 65
    Three, 2-hole connectors supplied with Issue 65
    Four long brass-coloured screws
    Gather together thirteen short black button head screws

    parts

    Tools and other items needed
    If you do everything that is described in the Stage 65 Assembly section of the magazine you will need the following:
    Screwdriver supplied with Issue 2 or similar

    Assembling the top frames
    When you screw the rib connector to the rib attached to TF-36, make sure you support it so there is no danger of either of the two parts of the radial rib bending out of shape. Check that you have screwed all the frame section corners to the flanges of the radial rib section that you have added this time.

    frame 1

    frame 2

    frame 3

    frame 4

    frame 5

    frame 6

    frame 7

    frame 8

    frame 9

    frame 10

    frame 11

    frame 12

    frame 13

    Tidy up and store
    Put the completed frame back on the jig for safe keeping. You will be needing it in Stage 66. Put the hull panel supplied with Issue 65 back in the parts pack and store it so you can find it easily.

Viewing 1 post (of 1 total)

The forum ‘Build Diaries’ is closed to new topics and replies.